Planned maintenance is more useful when the report helps you make a decision. Beyond confirming that a visit took place, it should explain what was checked, what was found and what needs attention next.

Define the assets and the work

Before comparing maintenance proposals, ask whether they cover the same equipment and tasks. An agreed asset list helps both parties identify what is included, what is excluded and where access or specialist input may be needed.

Useful scoping information includes equipment type, location, operating hours, access restrictions and any known concerns. Maintenance tasks should be agreed around the equipment and site requirements; statutory inspection requirements need to be identified separately.

Ask for findings you can act on

A practical maintenance record should let the reader distinguish between work completed and observations requiring a decision. We suggest asking for:

  • The asset or location the record relates to.
  • The tasks completed and any agreed tasks that could not be completed.
  • The condition or operational concerns observed.
  • Defects requiring repair, further investigation or specialist input.
  • Recommended actions and responsibility for follow-up.

If a priority rating is used, it should help the client identify what needs attention. It should not replace an explanation of the actual finding or the next action.

Consider operation as well as cleanliness

EECA identifies regular maintenance and smarter control settings as practical ways to improve heating and cooling efficiency. Maintenance planning can therefore include a discussion about how equipment operates, alongside the agreed physical service tasks. [1]

Where a building management system is present, available schedules and operating information may help identify unnecessary operation or other issues worth investigating. EECA describes BMS as a tool for monitoring and managing building systems. [2]

Any proposed operating change should be assessed against the building’s requirements and agreed with the responsible parties. A lower operating cost should not be assumed from a service visit alone.

Close the loop between visits

Use the previous report as an input to the next visit. Was the repair authorised? Has the concern recurred? Does the asset information need updating? Keeping these questions visible helps prevent a maintenance programme becoming a series of disconnected visits.

Northern Air NZ provides planned commercial HVAC maintenance, technical reporting and optimisation advice in Hamilton and Waikato. We agree the asset scope, reporting needs and follow-up responsibilities with you.

Sources and further reading

  1. EECA: Energy-saving tips for heating and cooling systems
  2. EECA: Building management systems